clinker boat under construction, dragon with new cedar deck, solid cherry unit, large solid cherry

clinker boat under construction, dragon with new cedar deck, solid cherry unit, large solid cherry
We handcraft beautiful wooden boats and furniture.

Friday, April 13, 2018

Flying Fish R emerging from shed... one step closre to launching

Long restoration projects tend to become part of the furniture of a workshop... they leave a gaping hole when they finally move out for launching!
There are still some niggly jobs to do now before the big day: checking all the plumbing (this was difficult to do inside the workshop with water) and solar electrics etc.
Props had to be built to transport the spars on top of the boat.